亚洲一级免费看,特黄特色大片免费观看播放器,777毛片,久久久久国产一区二区三区四区,欧美三级一区二区,国产精品一区二区久久久久,人人澡人人草

試題

12月英語六級閱讀模擬試題及答案

時間:2025-03-06 17:41:40 試題 我要投稿
  • 相關(guān)推薦

2016年12月英語六級閱讀模擬試題及答案

  2016年12月英語六級考試將在12月17日開考,為了幫助大家更好地備考,下面是yjbys網(wǎng)小編提供給大家關(guān)于英語六級閱讀模擬試題及答案,希望對同學(xué)們的復(fù)習(xí)有所幫助。

2016年12月英語六級閱讀模擬試題及答案

  In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular (標準件的) system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.

  There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.

  After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.

  After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.

  In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.

  1. The main difference between panel method and the method discussed in the last paragraph is_______.

  A. the latter uses ready-made internal features  B. panels are cast in a level position

  C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms

  D. the former is more expensive than the latter

  2. Which of these statements is TRUE of system building?

  A. It employs more men. B. It is difficult and dangerous. C. It can save both time and money. D. It means less mechanization.

  3. According to the passage, the principle of system building is that_______.

  A. construction methods are safer  B. buildings are made from a set of standardized units

  C. similar buildings can be produced  D. all units are produced on the site

  4. The usual fixed length in the modular system is_______.

  A. twenty centimeters B. ten millimeters  C. fifty centimeters D. ten centimeters

  5. What lifts the concrete panels onto the building?

  A. Cranes. B. Man-power.  C. Pulleys. D. Hydraulic jacks.

  答案 A C B D A

【12月英語六級閱讀模擬試題及答案】相關(guān)文章:

雅思閱讀模擬試題及答案04-18

全國英語六級閱讀模擬試題及詳解答案08-06

最新英語六級閱讀理解模擬試題含答案03-01

2017閱讀模擬試題及答案解析03-17

17年6月英語六級閱讀模擬試題及答案12-03

2016年英語六級仔細閱讀模擬試題及答案07-11

最新英語閱讀理解模擬試題及答案12-30

英語閱讀模擬試題及答案詳解201704-26

2017年雅思閱讀模擬試題及答案08-16